Pages

Monday, June 21, 2010

Army Corps of Engineers Releases Its Study -- It will look at water quality and waves

Just hot off my email desk, I received the following email from our Government Relations Director regarding the Army Corps of Engineers study that indicates they will include water quality and waves in the study but did note that: Additionally, the Study lists the various constraints on the project such as the Port of Long Beach berths, Navy anchorage, Long Beach peninsula, THUMS islands, marinas and docks, and navigational safety, and states that these areas must not be adversely affected.

We need to improve the water quality and circulation of the waters behind the breakwater. I am still concerned about where we get the monies to pay for the study -- I don't think Tidelands is the answer at this point. I will read the entire report and listen to the presentation tomorrow before I make my final decision about my vote.


The Army Corps of Engineers has released the East San Pedro Bay Ecosystem Restoration Study (Long Beach Breakwater Study) and it is now available for your review here. The report can also be accessed through the links below on the City's web page. The City Council is scheduled to hear a presentation on the Reconnaissance Study on June 22, 2010 and decide if the City of Long Beach will become the local sponsor for this project. This is a public meeting and we encourage you all to attend and share your input.


Summary of the Report
The study concludes that there is federal interest in proceeding to a Feasibility Study. In the Feasibility Study, the Army Corps would evaluate opportunities for ecosystem restoration, water quality improvements and recreation improvements in the East San Pedro Bay in Long Beach. The Reconnaissance Study identifies potential alternatives such as reconfiguring the Long Beach Breakwater, changes in alignment of the LA River, creation of rocky reef habitat and kelp features, and measures to address pollutants in the LA River. The specific alternatives would be further developed in the Feasibility Study through a community outreach process.
The Reconnaissance Study concludes that restoration of reef and kelp habitat within San Pedro Bay can be enhanced by improving the water quality, clarity, and circulation. It also concludes that the project could result in improved conditions for recreational swimming and surfing. Additionally, the Study lists the various constraints on the project such as the Port of Long Beach berths, Navy anchorage, Long Beach peninsula, THUMS islands, marinas and docks, and navigational safety, and states that these areas must not be adversely affected.
The Feasibility Study will take a minimum of 4 years to complete and will cost $8,337,400. In the Feasibility Study the Army Corps will conduct an extensive analysis including wave modeling, water quality modeling, economic analysis, environmental analysis, engineering and design analysis, geotechnical studies, review of tidal elevations, sediment transport, and analysis of other areas.


Links

Army Corps' Final Reconnaissance Study:
http://admin.longbeach.gov/civica/filebank/blobdload.asp?BlobID=27756
City's Breakwater Website: http://www.longbeach.gov/citymanager/ga/breakwater/default.asp
Army Corps Study Website: http://www.spl.usace.army.mil/cms/index.php?option=com_content&task=view&id=1462&Itemid=31
City Staff report for June 22nd City Council Item: http://longbeach.legistar.com/View.ashx?M=F&ID=943361&GUID=2A2973F4-4DDA-4612-A4CE-0FCA037AB258